Home > News > GSI Set Off the Wave of the Climax of Labor Competition for 120 Days

GSI Set Off the Wave of the Climax of Labor Competition for 120 Days

    

The naming ceremony was held on the morning of Oct. 18th. The two tankers, 50,000 DWT chemical/product oil tanker No.5 and 75,000 DWT crude oil tanker No. 1, were named during the ceremony, which were constructed by GSI subordinated by CSSC for the Danish TORM company. Meanwhile, there were three tankers docked on the No. 1 shipyard on the same day. These three vessels were constructed by GSI, which are 69,000 DWT crude oil tanker No.2 constructed for Shanghai Beihai Shipping Co. Ltd., 114,000 DWT crude oil tanker No.3 constructed for COSCO and 75,000 DWT crude oil tanker No.5 constructed for the VISTA shipping company.
Naming Ceremony
Ms. Pia McCandless from TORM's Human Resources Department in Copenhagen and Ms. Salvi from Marine Human Resources Department in Bombay named TORM 50,000 DWT product/chemical oil tanker No.5 and 75,000 DWT crude oil tanker No.1 respectively as “TORM SUBLIME” and “TORM Elise”.
Mr. Jesper S. Jensen, the deputy general manager of TORM, Mr. Boris Bondarenko, the vice president of DNVGL in southern China, Mr. Tian Bin, the vice President of LR Greater China, Mr. Chen Zhongqian, the chairman of GSI, Mr. Zhou Xuhui and Ou Chuanjie, the vice president of GSI, and other leaders attended the naming ceremony.
On behalf of GSI, Mr. Ou delivered a speech at the ceremony. He said that the two technologically advanced and top-quality tankers named today are especially well-built for TORM, which are energy-saving and efficient tankers built by GSI. GSI has promoted the craftsmanship spirit of excellence and has successfully delivered 25 high-quality oil tankers for TORM. It is hoped that both sides will continue to give full play to their superiority and promote all-round cooperation at a higher level. And both of two sides will work together to create a new situation of mutual benefit and win-win development.
Mr. Jesper S, the deputy general manager of TORM, on behalf of the shipowner, he expressed his sincere congratulations on the 70th anniversary of the founding of New China and he also hoped that TORM will continue to strengthen cooperation with GSI and to create much more better valuable development for both parties.
Docking Ceremony
Around the same time, 69,000 DWT crude oil tanker No.2 constructed for Shanghai Beihai Shipping Co. Ltd., 114,000 DWT crude oil tanker No.3 constructed for COSCO and 75,000 DWT No.5 constructed for the VISTA shipping company were docked on the No. 1 shipyard. And all these three tankers were built by GSI. Representatives of product ship project managers, shipowners' supervision teams and ship inspections attended the ceremony and signed supporting documents on behalf of the parties. It is understood that the 75,000 DWT No.5 built by GSI for the VISTA Shipping Company also began to be docked on the same day.

Website Map | Contact Us
Guangzhou Shipyard International Company Limited All rights reserved
Add:18 Qihang Road, Longxue Street, Nansha District, Guangzhou, China. Post Code:511462
Tel:86-20-36663046 Fax:86-20-36663000-0 Email:gsi@chinagsi.com
Maintenance: Information technology center of China State Shipbuilding Corporation
Add: No. 5 Yuetan North Street, Xicheng District, Beijing
Tel: (+0861)59518822 Fax: (+8610)59517959 Email: client@shipbuilding.com.cn
沪ICP备14028183号